GRDF

Modeling gas network extension programs.

Contexte

GRDF's regional studies offices have a legal obligation to study the integration of any biogas project in less than two weeks.
They do not have the appropriate modeling tools that can quickly model an eventual integration and estimate its resilience and costs.

Impact

Optimizing engineering processes (divided by 5) and securing processes.

Intervention DCbrain

Creating a double-digital for the entire network
Based on the technical characteristics of the ENR project (volume and location), the tool:
Validates its ability to be consumed by the existing network and customers
Calculate automatically crop costs.

Download our white paper on the integration go green gases with AI